Inclinators™
Sixty metres down a dam wall, daily

SA Water approached P. R. King & Sons needing a way for staff to travel to and from the Mt Bold Reservoir facility every day for water testing — down a steep hillside beside the dam.
The solution
A Single Rail Inclinator with a 60-metre travel was the answer — one of the more challenging installations we’ve undertaken. Two cranes were needed to complete the job, and because the ground on the hillside beside the dam lacked stability, cantilevered rail support brackets were engineered and fitted for the rail to run on. The four-person carriage now makes the daily trip routine.
Want to see our full range of Inclinators™? Explore Inclinators™ or talk it through with our team.